Metro Point

0

Metro Point

Published by suttonadmin at 10th September 2020
Categories
    IMG_3354
    • ClientMetro Point
    • Task

      Sutton Projects worked alongside Amey in delivering both fabric and mechanical upgrades to all 5 levels at Metro Point, Croydon. The overall programme ran for approximately 4 months, our security cleared engineers worked closely to specification drawings prepared externally by the client’s architect.

      Works included general strip out, re-modelling of partitions, M&E installations, carpeting, redecorations, toilet and shower upgrades and the construction of bespoke print areas.

      The overall finish was to a high standard and the client was extremely satisfied with the final results.