Wembley National Stadium – B2 Club Wembley Reception

In December 2012 Sutton Projects were awarded the task of refurbishing the B2 Club Wembley reception. This entrance to the stadium is used by a number of high profile guests, some of which have meetings and events, whilst others use the entrance to get to hospitality suites and private boxes. Prior to starting the project we were given a 3D visual of how the directors wanted the reception to look, we didn’t receive any detailed specification or drawings, as a result the project went from a designing stage all the way through to the construction.

Whilst refurbishing the area almost all our tradesman were utilised, from carpenters to dry liners to decorators to floorers. Being the principal contractor we worked alongside Wembley’s specialist electricians and fire detection engineers to ensure every aspect of the job was completed.
After our 6 week programme came to an end an opening ceremony held, attended by special guests, directors and general staff. We received much appraisal for the works completed and were awarded a number of other jobs on the back of our success.